Subway Road

Project details:

Client:  Wales & West Housing

Team:  Total Regen

Type: JCT Design & Build Contract

Location: Rushcliffe, Nottingham

Project value: £2,990,000

Procurement: Competitive Tender

Project Overview

Scheme Overview: We are building this scheme on behalf of Wales & West Housing Association. The development consists of two apartment blocks with a mixture of 1 and 2 bedrooms. There are 40 units in block 1 and 32 units in block 2.

The Challenge

Working on a live and constrained school site has many complex challenges including:

  • Controlled delivery times with noise generating activities planned within certain time slots outside of school hours.
  • Restricted access through a one way road system to the school carpark, where the site is located. This needed to be kept accessible for buses, cars and the school to access the gymnasium facilities behind the site.
  • Connection of the gas and water mains required digging up the one way road system, this was planned and delivered during half term.
  • Safeguarding, DBS checks on the management team and contractors are conducted, the movement of contractors is controlled through the Site Manager and a secure site boundary.

Subway Road

We are building this scheme on behalf of Wales & West Housing Association. The development consists of two apartment blocks with a mixture of 1 and 2 bedrooms. There are 40 units in block 1 and 32 units in block 2.

Coed Housing Project

We are building a collection of 2, 3 and 4 bedroom family homes on behalf of Candleston Homes. There will be a total of 51 properties designed to meet the needs of contemporary living, each home offers a spacious and stylish layout, 

Maelfa Regeneration

Total Regeneration have teamed up with Cardiff Community Housing Association (CCHA) and Cardiff Council to give Llanedeyrn a much-needed regeneration scheme. The old Maelfa shopping centre had become very much dated

Springfield Road Housing

Total Regeneration was contracted to build 40 affordable homes made up of different sized houses and flats. The project involved strip foundations, block and beam floors, timber frame superstructure and floors, pitched concrete tile roofs with face brickwork, render and cladding

Rumpoles Cardiff

Total Regeneration constructed with timber frame over five storeys which was sub-divided and serviced via three separate core areas with lifts and staircases. The façade was a mixture of brick and render finish with a rotunda for the central section. 

Grigy Wron Housing

The partial demolition, refurbishment and conversion of the former Victorian primary school, Graig y Wion, into 28 new residential units. Fifteen apartments have been provided within the two three-storey new builds, three in bungalows, whilst 10 apartments were housed 

Close Park Development

Total Regeneration were contracted to build 35 residential units consisting of 18 flats spread over 2 blocks, each with 3 floors and containing 9 flats along with communal staircase along with 17 houses. 

Liberty Court

The development, programmed over a 15 month period, consisted of 32 new apartments for the over 55s, a community library and substantial commercial space which is available for rent to local businesses and community groups. 

Ready to start your project ?

Committed to Excellence at all levels

0 %
Satisfied clients
0 %
Projects completed on time
0 %
Projects completed on budget
0 %