Residential Case Studies

Total Regeneration have considerable experience in delivering land, design and planning services through to contracting, development and joint ventures for both private and public sectors. Our vast experience working with Registered Social Landlords have led to consistently high-quality innovative developments which exceeds local housing needs. Whether through new build contracting, package deals or joint ventures our construction and development partnerships are designed to deliver the full mix of tenure solutions whilst contributing to creating sustainable communities through our design and community activities such as targeted recruitment and training.

Subway Road

We are building this scheme on behalf of Wales & West Housing Association. The development consists of two apartment blocks with a mixture of 1 and 2 bedrooms. There are 40 units in block 1 and 32 units in block 2.

Coed Housing Project

We are building a collection of 2, 3 and 4 bedroom family homes on behalf of Candleston Homes. There will be a total of 51 properties designed to meet the needs of contemporary living, each home offers a spacious and stylish layout, 

Maelfa Regeneration

Total Regeneration have teamed up with Cardiff Community Housing Association (CCHA) and Cardiff Council to give Llanedeyrn a much-needed regeneration scheme. The old Maelfa shopping centre had become very much dated

Springfield Road Housing

Total Regeneration was contracted to build 40 affordable homes made up of different sized houses and flats. The project involved strip foundations, block and beam floors, timber frame superstructure and floors, pitched concrete tile roofs with face brickwork, render and cladding

Rumpoles Cardiff

Total Regeneration constructed with timber frame over five storeys which was sub-divided and serviced via three separate core areas with lifts and staircases. The façade was a mixture of brick and render finish with a rotunda for the central section. 

Grigy Wron Housing

The partial demolition, refurbishment and conversion of the former Victorian primary school, Graig y Wion, into 28 new residential units. Fifteen apartments have been provided within the two three-storey new builds, three in bungalows, whilst 10 apartments were housed 

Close Park Development

Total Regeneration were contracted to build 35 residential units consisting of 18 flats spread over 2 blocks, each with 3 floors and containing 9 flats along with communal staircase along with 17 houses. 

Liberty Court

The development, programmed over a 15 month period, consisted of 32 new apartments for the over 55s, a community library and substantial commercial space which is available for rent to local businesses and community groups. 

Royal Building Port Talbot

The project involved the demolition of the existing 2, 3 and 4 storey buildings which completely covered the development site area and consisted of retail units and workshops to the ground floor with office space above. 

Passivhaus

We are building this scheme on behalf of Linc Cymru Housing Association, the development will consist of; 34 flats and 4 general needs mid terrace houses. The development will also include an outdoor fitness area and edible elements within the landscaping to further improve residents’ health.

NPT Developments

The project was constructed via a design and build contract and drew extensively on Total Regenerations’s expertise stretching across a variety of renewable technologies. The steel frame, three storey building had an extensive collection of sustainable features including ground source heat pumps, solar thermal 

Rugby Club Community Facility

The new building which was built on the site of the former Salisbury Hotel in Ferndale has been constructed as a community facility for Rhondda Life and also doubles as the clubhouse for Ferndale RFC. The building contains three function rooms and three bar areas.  A pre-demolition assessment of the existing Salisbury Hotel was carried out

Ready to start your project ?

Committed to Excellence at all levels

0 %
Satisfied clients
0 %
Projects completed on time
0 %
Projects completed on budget
0 %
Repeat business

2021-2022 All rights reserved, under any circumstances should any content be copied without the prior consent of the Total Contracting Group

Scroll to Top